Industrial

BAKER HUGHES – CLAREMORE FACILITY

Baker Hughes' Artificial Lift Research and Technology Center features four interconnected buildings, including a 105-foot-tall high-bay test facility, a 28,000-square-foot workshop, and a two-story office building, all designed with advanced capabilities like crane systems and adaptable floor plans. The facility was constructed with structural steel framing, bar joists, cast-in-place concrete foundations, and specialized elements like composite steel floors and thick concrete lids.

project details

square footage:
82,000
architect:
Energy Architecture
completed:
2014
construction cost:
$36,000,000

project description