This project is a two-story facility featuring offices, laboratories, and curtainwall entrances, designed to blend with the surrounding campus structures. Key challenges included meeting an accelerated eight-week design schedule, coordinating complex framing for cantilevers and open floor plans, and addressing secondary framing for canopies at curtainwall locations. The construction incorporates structural steel, bar joists, concrete tilt-wall panels, and composite second-floor framing to optimize space for building systems.